Transformer Capacity and No-Load Load Testing Tester

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1 Year
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (25)
  • Transformer Capacity and No-Load Load Testing Tester
  • Transformer Capacity and No-Load Load Testing Tester
  • Transformer Capacity and No-Load Load Testing Tester
  • Transformer Capacity and No-Load Load Testing Tester
  • Transformer Capacity and No-Load Load Testing Tester
  • Transformer Capacity and No-Load Load Testing Tester
Find Similar Products
  • Overview
  • Company Profile
  • Certifications
  • Product packaging
  • FAQ
Overview

Basic Info.

Model NO.
KDRB-ZH
Temperature
-20~50ºC
Characteristic Part
Voltage: 20~650V
Current Output
0~10A
Customized Support
OEM, ODM, Obm, Software Reengineering
Test Capacity
Capacity Measurement Range: 30kVA~65000kVA
Humidity
10%~85%
Frequency
45Hz~65Hz
Charger
DC 5V/3A
Current
0.5~100A
Power
Electronic
Altitude
<2500m
Trademark
KDZD
Origin
Hubei, China
HS Code
9030332000

Product Description

Transformer Capacity and No-Load Load Testing Tester

 

 
Product Overview
 
The transformer energy efficiency grade comprehensive tester is a precision instrument used to measure transformer capacity, no-load, load and other characteristic parameters. This instrument is a multi-functional measuring instrument, equivalent to the usual two test instruments: transformer capacity tester + transformer no-load tester. It can accurately measure a series of power frequency parameters such as capacity, type, no-load current, no-load loss, short-circuit (load) loss, impedance voltage, etc. of various transformers. This product has many advantages such as small size, light weight, high measurement accuracy, good stability, and simple operation. It can replace the previous method of using multiple meters to measure transformer loss and capacity. The wiring is simpler, and testing and recording are more convenient, which greatly improves your work efficiency.
 
1.Environmental conditions
 
Temperature
-20C~50C
Environmental humidity
10%~85%
Altitude
2500m
External interference
no strong vibration, no strong electromagnetic field
2.Measurement range
 
Active part
 
Current output
0~10A
Voltage measurement
0~10V
Test capacity 
Capacity measurement range 30kVA~65000kVA
Characteristic part
Voltage: 20~650V
Current
0.5~100A
Frequency
45Hz~65Hz
3.Test accuracy
 
Voltage, current ±(reading×0.2%+2 characters)
0dB~60dB
Power (0.2≤cosφ≤1) ±(reading×1.0%+2 characters)
1dB
Capacity ±(reading×10%+2 characters)
±1dB
4. Insulation strength
 
The insulation resistance of the voltage and current input terminals to the housing is ≥100MΩ.
 
The working power input terminal is subjected to 2KV (effective value) of power frequency between the casing and the working power input terminal for 1 minute.
 

Functional characteristics

1. It can accurately measure the capacity of various distribution transformers, conveniently and accurately.
2. It can measure the no-load current, no-load loss, short-circuit voltage, and short-circuit (load) loss of the transformer.
3. The instrument automatically switches the range, allowing a wide range of voltage and current to be measured, and the wiring is simple.
4. A single machine can complete the measurement of the load test of distribution transformers below 1000KVA at full current; it can complete the measurement of the load test of distribution transformers below 3150KVA at one-third of the rated current (at one-third of the rated current, the instrument can convert to the load loss parameters at the rated current).
5. All test results are automatically corrected. The instrument can automatically perform various corrections such as waveform correction, temperature correction, non-rated voltage correction, non-rated current correction, etc., to make the test results more accurate.
6. It uses a 7-inch touch screen, a full Chinese menu and operation prompts to achieve friendly human-computer dialogue, the touch screen makes the operation easier, and the wide temperature LCD has brightness adjustment, which can adapt to all seasons in winter and summer.
7. It comes with a real-time electronic clock, which automatically records the date and time of the test, which is conducive to the preservation and management of the experimental results.
8. The panel thermal printer can quickly print the test results on site.
9. The data (test sample settings, measurement results, test time, etc.) has power-off storage and browsing functions, which can store more than 1,000 sets of experimental results, and the USB can export the test data.
10. It allows external voltage transformers and current transformers to perform extended range measurements, and can measure any parameter of the test sample.
11. The instrument can accurately measure and judge the energy efficiency level of 10kV distribution transformers, and corresponding to the energy efficiency level, the oil-immersed transformer loss can be measured to S22 (electrical steel strip) and SH25 (amorphous alloy); the dry transformer loss can be measured to SCB18 (electrical steel strip) and SCBH19 (amorphous alloy).
 
Transformer Capacity and No-Load Load Testing Tester
Transformer Capacity and No-Load Load Testing Tester
Transformer Capacity and No-Load Load Testing Tester
Transformer Capacity and No-Load Load Testing Tester
Transformer Capacity and No-Load Load Testing Tester
 
Company Profile
Transformer Capacity and No-Load Load Testing Tester
Transformer Capacity and No-Load Load Testing Tester
Certifications
Transformer Capacity and No-Load Load Testing Tester
Product packaging
Transformer Capacity and No-Load Load Testing Tester
FAQ
Transformer Capacity and No-Load Load Testing Tester
1. How is our product? 
    We are manufacturer, so preferential price and high quality can guarantee. 
 
2. How soon to get price?
     Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will       do in priority. 
 
3. Whal is your terms of delivery?
     EXW,FOB, CFR, CIF, ect. Pls select your most conveient and cost effective. 
 
4. When there is difficulty in using ? 
     We will first provide equipment operation manual, operation video, or provide training through remote         video call. Ifnecessary, engineers will serve on door. 
 
5. What about the leading time for production? 
    That depends on order qty and product item. For normal items, usually within 3 working days. Delivery      time is determined by the logistics , generally is 5-7 days. 
 
6.How to send? 
    For most of our customers, we provide door-to-door service. You only to through import customs                clearance proceduresand pay the import tariff. 
 
7. How is packing and will the goods be damaged? 
     We will pack standard export packing for everyequipment, so far there is no damage yet, pls no worry.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier